保證電纜橋架質(zhì)量的措施有哪些?
1、施工前組織施工人員進(jìn)行技術(shù)交底工作,并做好交底會(huì )簽,將責任落實(shí)到每一個(gè)操作工人。
1. Organize the construction personnel to carry out technical submission work before construction, and do a good job of submission meeting signature, and implement the responsibility to every operator.
2、材料進(jìn)入施工現場(chǎng),必須按產(chǎn)品標準及規定程序進(jìn)行檢查驗收,并做好記錄及材料報驗工作,嚴禁不合格產(chǎn)品用于工程中。
2. When materials enter the construction site, they must be inspected and accepted according to the product standards and prescribed procedures, and record and material inspection should be done well. It is strictly forbidden to use unqualified products in engineering.
3、熟悉設計圖紙,理解并掌握設計意圖,發(fā)現問(wèn)題及時(shí)聯(lián)系建設、監理、設計單位,做好圖紙會(huì )審工作。
3. Familiar with design drawings, understand and master design intentions, contact construction, supervision and design units when problems are found, and do a good job of drawing auditing.
4、橋架的運輸和堆放應附合有關(guān)規定,注意防潮防污。
4. Transportation and stacking of bridge frames should be accompanied by relevant regulations, and attention should be paid to moisture-proof and pollution-proof.
5、使用高凳時(shí),注意不要碰壞建筑物的墻面及門(mén)窗。
5. When using high benches, be careful not to touch the walls and doors and windows of buildings.
6、嚴格按標準、規范、規程及設計圖紙組織施工,施工中應與水暖、土建密切配合,施工質(zhì)量必須符合現行標準及規范規定。
6. Construction should be organized in strict accordance with standards, norms, regulations and design drawings. Construction should be closely coordinated with plumbing and civil engineering specialties. Construction quality must conform to current standards and norms.
7、施工過(guò)程中及時(shí)做好中間檢查工作,發(fā)現問(wèn)題及時(shí)解決,施工完后,做好自檢工作,自檢通過(guò)后再通知監理單位工程師進(jìn)行隱蔽前驗收工作。
7. In the process of construction, do a good job of intermediate inspection, find problems and solve them in time. After completion of construction, do a good job of self-inspection, and inform the professional engineers of supervision units to check and accept the work before concealment.
8、技術(shù)資料應隨工程進(jìn)度及時(shí)報驗、整理,按系統分類(lèi)、歸檔,各種原始檢測記錄應真實(shí)、準確、齊全。
8. Technical data should be submitted and collated in time with the progress of the project, classified and filed according to the system, and all kinds of original testing records should be true, accurate and complete.
9、對于易發(fā)生受污生部位(如機房、電氣豎井等)的橋架,應注意檢查,發(fā)現后及時(shí)處理,補刷防銹漆。
9. For bridges that are liable to contamination (such as machine rooms, electrical shafts, etc.), attention should be paid to inspection, timely treatment after discovery, and repairing rust-proof paint.
本文精彩內容由電纜橋架整理提供!希望通過(guò)小編的介紹對大家有所幫助,我們的官網(wǎng)是:http://www.cepo-eca.com多謝大家的閱讀觀(guān)看!
The wonderful content of this article is provided by the cable bridge arrangement! Hope to help you through the introduction of Xiaobian, our official website is: http://www.cepo-eca.com Thank you for reading and watching!