濟南電纜橋架: 橋架間距應該如何設置?

  電纜橋架水平安裝時(shí),支吊架之間距離適合在1.5米~2米,在轉彎處的支吊架間距應為0.3米~0.6米,垂直安裝電纜橋架時(shí),支吊架間的距離不應該超過(guò)2米。下面由濟南航豐實(shí)業(yè)的小編給大家介紹一下安裝電纜橋架間距要求的相關(guān)內容。

When installing cable trays horizontally, the distance between supports and hangers should be suitable between 1.5 to 2 meters. The distance between supports and hangers at turns should be between 0.3 to 0.6 meters. When installing cable trays vertically, the distance between supports and hangers should not exceed 2 meters. Below, the editor from Jinan Hangfeng Industry will introduce the relevant content on the spacing requirements for installing cable trays.

  電纜橋架與一般工藝管道平行鋪設時(shí),敷設間隔少400毫米,與工藝管道交叉敷設時(shí),安裝間距小為300毫米,電纜橋架與腐蝕氣體管道的平行間距少為500毫米,交叉間距小為500毫米。電纜橋架水平安裝時(shí),應該按照載荷規范選擇支、吊架間距,距離不應該大于2米。電纜橋架支、吊架的間距也要參考其產(chǎn)品性能參數說(shuō)明來(lái)設置。

When the cable tray is laid parallel to the general process pipeline, the laying interval should be at least 400 millimeters. When cross laid with the process pipeline, the installation interval should be at least 300 millimeters. The parallel spacing between the cable tray and the corrosive gas pipeline should be at least 500 millimeters, and the cross spacing should be at least 500 millimeters. When installing cable trays horizontally, the spacing between supports and hangers should be selected according to the load specifications, and the optimal distance should not exceed 2 meters. The spacing between cable tray supports and hangers should also be set according to the product performance parameter specifications.

20210330042649173.png

  單層電纜橋架安裝時(shí),配套支吊架的間距不應該大于2米,電纜橋架多層同時(shí)敷設時(shí),支吊架之間的距離應該根據載荷進(jìn)行具體計算。電纜橋架與無(wú)保溫的熱力管道水平敷設時(shí),平行間距少為1米,交叉鋪設時(shí)的小間距應為0.5米,電纜橋架與有保溫措施的熱力管道交叉敷設時(shí)距離小為300毫米,水平鋪設時(shí)距離少為500毫米。

When installing single-layer cable trays, the spacing between supporting brackets should not exceed 2 meters. When laying multiple layers of cable trays simultaneously, the distance between brackets should be calculated specifically based on the load. When cable trays are horizontally laid with uninsulated thermal pipelines, the parallel spacing should be at least 1 meter, and the minimum spacing when cross laid should be 0.5 meters. When cable trays are cross laid with insulated thermal pipelines, the minimum distance is 300 millimeters, and when horizontally laid, the distance is at least 500 millimeters.

  本文由 濟南電纜橋架 友情奉獻。更多有關(guān)的知識請點(diǎn)擊: http://www.cepo-eca.com 真誠的態(tài)度,為您提供為的服務(wù)。更多有關(guān)的知識我們將會(huì )陸續向大家奉獻,敬請期待。

This article is dedicated to the friendship of Jinan cable tray. For more information, please click on: http://www.cepo-eca.com Sincere attitude, providing you with comprehensive service. We will gradually contribute more relevant knowledge to everyone, please stay tuned.

 